Custom Doosan Fuel Injector Assy 400903-00223 Develon Genuine Parts D18 D24 Manufacturer, Manufacturers

1.Product Name:

Fuel Injector

2.Part number:

400903-00223

3.Compatible For:

Doosan and Develon machinery D18 D24 D34

4.Leading time:

2-3 days

5.Packing way:

Neutral packing or CAT Genuine Part Packing

6.Price:

USD 450

Product Description

The notice during the production of the Doosan fuel injector

Quality Control Standards: Guidelines on maintaining quality throughout the production process, including inspection points and testing procedures.
Safety Protocols: Instructions to ensure the safety of workers, including the use of personal protective equipment (PPE) and emergency procedures.
Production Schedules: Timelines for production runs, including deadlines for different stages of manufacturing.
Material Specifications: Details on the types of materials to be used, including any certifications required for those materials.
Equipment Maintenance: Notices regarding the maintenance of machinery used in the production process to ensure optimal performance.
Environmental Compliance: Guidelines to ensure that production processes comply with environmental regulations, including waste management and emissions control.

1. Raw material inspection

Supplier Audit: Evaluate and audit raw material suppliers to ensure they meet quality standards.
Material Testing: All incoming raw materials are tested for physical and chemical properties to ensure they meet design requirements.

2. Production process monitoring

Process Control: Use statistical process control (SPC) tools during production to monitor key parameters (such as temperature, pressure, flow, etc.).
Real-time data logging: Use automated systems to record production data for easy tracking and analysis.

3. Technology Standards

Standard Operating Procedure (SOP): Develop detailed SOP to ensure that each operator can operate in accordance with the standard.
Process Validation: Regularly validate the production process to ensure its effectiveness and consistency.

4. Intermediate product inspection

Phase inspection: Conduct quality inspections on intermediate products at key stages of production to identify potential problems in a timely manner.
Functional testing: Perform functional testing on intermediate products to ensure that they meet design requirements.

5. Final product testing

Full Testing: After the product is completed, it undergoes a full performance test including spray pressure, spray pattern and durability testing.
Certificate of Conformity: Each qualified fuel injector shall be accompanied by a test report and a certificate of conformity.

Frequently Asked Questions (FAQ)

Q1: How are raw materials inspected before production?

A1: We audit raw material suppliers to ensure compliance with standards and test all incoming materials for physical and chemical properties to meet design specs.

Q2: What parameters are monitored during the production process?

A2: Key parameters such as temperature, pressure, and flow are monitored using statistical process control (SPC) tools, with all data logged automatically in real-time.

Q3: What standard procedures ensure consistency in injector manufacturing?

A3: Detailed Standard Operating Procedures (SOP) are established for each operator, and the production process is regularly validated to ensure consistency.

Q4: Why is intermediate product testing important?

A4: Conducting phase inspections and functional testing at key stages helps identify potential quality and performance issues early in the assembly process.

Q5: What performance tests are conducted on the final fuel injector?

A5: The finished fuel injectors undergo full performance testing, which includes spray pressure, spray pattern, and durability testing, before receiving a certificate of conformity.

Related Products